DE / EN
Seite ausdrucken
Land auswählen

    News

    The wastewater treatment plant in Eriskirch, Baden-Württemberg, with a population equivalent (PE) of 50,000, took part in various long-term studies on micropollutants in the Schussen River between 2000 and 2015. The conclusion of...


    Practical - scientific - communicative - personal: This was the motto of the GWA State Association Conference Baden-Württemberg which took place on the 15th and 16th October 2019 in the CongressCentrum Pforzheim. The numbers...


    HOLINGER is participating in a Federal Ministry of Education and Research joint project called PEPcat. The aim of the project is the development of an energy- and resource-efficient process for the aftertreatment of water from...


    On 10.10.2019, the topping-out ceremony marked the next milestone in the construction of the Mörscher Wald waterworks. Nine offices from three countries are involved in this major project, with a total cost of around € 40...


    In August 2019, the Institute of Fluid Dynamics at the Helmholtz Centre in Dresden received a grant from the Helmholtz Association to establish the CLEAWATEC innovation lab. The objective is to promote collaboration between...


    Die Schutzzonenüberprüfung des bestehenden Grundwasserpumpwerk Häspech in Lausen hat einige Nutzungskonflikte zutage gefördert. Von Seiten Grundeigentümern hat dies zu Widerstand geführt. Im Rahmen einer Variantenstudie werden...


    MIKE 21 can be used to create 2D surface runoff models and to directly test possible mitigation measures. HOLINGER has implemented one such model for the municipality of Bettingen (BS). Discharge hydrographs were created for the...


    In January 2017, HOLINGER was commissioned by the Office for Waste, Water, Energy and Air (AWEL) of the Canton of Zurich to revise the hazard maps in three municipalities. A working group revised the flood hazard maps and created...


    In the context of the General Drainage Plan (GDP) of the wastewater association for the Laufental-Lüsseltal region, HOLINGER is constructing a mixed water basin in the parish garden of the Herz-Jesu church in Laufen. The...


    Displaying results 1 to 9 out of 23